Ghodegaon 12 MW Site

Report Information
Activity Progress

Fencing Installation

Chain Link Fencing · Total: 1320 meters

Module Installation

MMS Work (Module Mounting Structure) · Total: 930 units

Structure Erection

MMS Work (Module Mounting Structure) · Total: 12 MW

Control Room Construction

MCR Work (Main Control Room) · Total: 1 building

Inverter Room Setup

ICR Work (Inverter Control Room) · Total: 1 room

6 sq mm DC Cabling

DC Cable Work · Total: 5000 meters

300 sq mm DC Cabling

DC Cable Work · Total: 2000 meters

AC Cable Laying

AC Cable Work · Total: 3000 meters

String Main Box Installation

SMB Installation · Total: 62 boxes